Welcome to Praetorian IQ

Data under verification · Numbers will be updated once confirmed

Cost Intelligence
Estimates & actuals
Estimate snapshots, stage gate accuracy, actuals vs estimate comparisons, commodity coverage, and ETL load status.
Document Library
Corporate & QA documents
237 documents indexed from PCML SharePoint Corporate Governance and QA / Quality with live search and deep links.
AI Insights
Claude analysis
Ask Claude: cost comparisons, outlier detection, contingency recommendations, WBS pattern analysis.
Schedule Optimisation
Critical path · Float analysis
Critical path, near-critical watch list, and AI-driven schedule compression opportunities.
Proposal Tool
Build cost proposals
Create cost proposals from templates, modify line items, and submit for approval.
Coming next
Templates Library
WBS templates
Reusable cost estimation templates, tagged by project type, commodity, and stage gate.
Coming next
Projects at a Glance 6 of 37 extracted
Amulsar
Lydian International · Gold · IFC
Data verification in progress · Actuals and estimates under review
Island Gold
Alamos Gold · Gold ·
TBD Actuals (PRISM)
Bestech Calabrian
TBD Actuals (PRISM)
Conuma Coal
Conuma Coal Resources · Coal · FS
CA$0.00 Actuals (PRISM) + CA$24,298,418 est. FWS 2020 estimate
Springpole
First Mining Gold · Gold · PFS 2023
TBD PFS estimate · 1,216 line items
Cerro Blanco
Bluestone Resources · Gold/Silver · FS 2018
TBD FS estimate · 1,383 line items
Back River ⚠ pending
Sabina Gold & Silver · Gold/Silver · FS 2022
TBD FS estimate · 8,713 line items · REV 7
Portfolio Summary
Verified actuals (PRISM) TBD
Estimate portfolio TBD
Total estimate line items TBD
Documents indexed TBD
Projects in portfolio TBD
Praetorian
Speak with Our Team
Cost Intelligence
Total Estimate Portfolio
TBD
4 estimates · 4 projects
Verified Posted Actuals
TBD
4 projects · Source: PRISM
Amulsar Estimate vs Actuals
TBD
Actuals exceed IFC estimate
Estimate Line Items Extracted
TBD
Amulsar Actuals vs IFC Estimate
Data verification in progress · Actuals and estimates under review
Estimate Snapshots Add snapshot ›
Estimate Stage Gate Class Total (CAD) Accuracy
Amulsar Estimate-to-Schedule Rev 13
Lydian International · Commodity: Gold
PRISM ETL · 28 Jul 2026
Issued for Construction (IFC) Class 2
$490,835,062
795 line items
−5% / +10%
Cerro Blanco 2018 Feasibility Study
Bluestone Resources · Commodity: Gold / Silver
PRISM ETL · 29 Jul 2026
Feasibility (FS) Class 3
$259,671,738
USD × 1.3272 · 1,383 line items
−15% / +20%
Springpole PFS 2023 Capex
First Mining Gold Corp · Commodity: Gold
PRISM ETL · 29 Jul 2026
Pre-Feasibility (PFS) Class 3
$1,380,062,261
USD × file FX · 1,216 line items
−20% / +30%
Back River 2022 Feasibility Study (REV 7)
Sabina Gold & Silver · Commodity: Gold / Silver
⚠ Pending Validation ETL · Jan 2022
Feasibility (FS) Class 3
$682,725,110
USD × 1.2498 · 8,713 line items
−15% / +20%
Back River 2022 Feasibility Study (REV 7)
Sabina Gold & Silver · Commodity: Gold / Silver
⚠ Pending Validation ETL · Jan 2022
Feasibility (FS) Class 3
$682,725,110
USD × 1.2498 · 8,713 line items
−15% / +20%
Estimate Portfolio Share CA$2.81B total
Springpole PFS $1.38B (49.1%)
First Mining Gold · Gold · Pre-Feasibility
Back River FS ⚠ $682.7M (24.3%)
Sabina Gold & Silver · Gold/Silver · Feasibility · Pending validation
Amulsar IFC $490.8M (17.4%)
Lydian International · Gold · Issued for Construction
Cerro Blanco FS $259.7M (9.2%)
Bluestone Resources · Gold/Silver · Feasibility
Posted Actuals (PRISM)
Amulsar Actuals $3.39B
Estimate Accuracy Comparison
ProjectClassStage LowHigh ContingencyBand
Amulsar Class 2 IFC Data verification in progress
Cerro Blanco Class 3 FS −15% +20% Medium
Springpole Class 3 PFS −20% +30% 2.63% Wide
Back River ⚠ pending Class 3 FS −15% +20% Medium
Commodity Coverage 3 projects · 4 extracted
Gold
3 projects
Silver
1 project
Coal
1 project
Base Metals
0 extracted
Oil & Gas
Pending
+ More
33 of 37 remaining
Extraction Progress
4 of 37 (10.8%)
Praetorian
Speak with Our Team
Document Library
237 documents
AI Document Search Powered by Claude · Praetorian IQ
⏳ Searching document library…
AI Response
Clear
Praetorian
Speak with Our Team
AI Insights
Try asking
Ask Claude about this data Powered by Claude · Praetorian IQ
Export Intelligence Report
LIVE

Generate a formatted project intelligence summary combining AI-generated insights with underlying cost data estimate snapshots, actuals comparisons, accuracy benchmarks, and WBS breakdowns exported as a professional deliverable ready for client or executive distribution.

PDF Report
.pdf · Print-ready
  • PCML-branded cover page
  • AI insight narrative
  • Portfolio summary table
  • Cost breakdown charts
  • Accuracy comparison
  • Confidentiality footer
Word Document
.doc · Opens in Word
  • Fully editable report
  • AI insight narrative
  • Portfolio data tables
  • WBS cost breakdown
  • Calibri · Canadian English
  • PCML-branded template
Excel Data Export
.xlsx · Full dataset
  • All estimate line items
  • Actuals vs estimate tab
  • WBS cost breakdown tab
  • Accuracy benchmarks tab
  • Portfolio summary tab
  • Pivot-ready format
All exports include the AI-generated response, portfolio cost summary, and a PCML confidentiality notice. Data current as of last ETL load.
AI analysis powered by Claude via Anthropic API.
Praetorian
Speak with Our Team
Schedule Optimisation
SPRINGPOLE
Integrated Project Schedule (20260729) V3  ·  First Mining Gold  ·  Data date: 28 Jul 2026  ·  Oracle Primavera
STATIC DEMO
First Gold (Milestone)
2 Sep 2031
0d total float hard end date
Schedule Duration
3,041d
Apr 2021 A → Sep 2031
Critical Path Activities
7
Chains with 0d total float
Near-Critical Activities
33
≤90d total float
AI Schedule Analysis Powered by Claude
Activities with 0 total float any delay directly impacts First Gold 2 Sep 2031.
Chain 1 Feasibility Study Restart → Environmental Baseline
A6460 · FS Restart · 0d · 28 Jul 2026 A6550 · Aggregate Resource Investigation & Hydrogeology Study · 110d · 28 Jul 28 Dec 2026
Gates the AS2 Aggregate Resource License preparation start on 29 Dec 2026.
Chain 2 Aggregate Resource License (MNR) · LONGEST CRITICAL CHAIN 401 days
A5000 · AS2 Prepare Application · 151d · 29 Dec 2026 27 Jul 2027 A6710 · AS2 Submit Application · 0d · 27 Jul 2027 A6720 · AS2 Permit Approval · 250d · 27 Jul 2027 11 Jul 2028
Single most exposed dependency. Gates all access road construction. Permit approval by MNR cannot be accelerated preparation phase (151d) is the compression target.
Chain 3 Access Road Construction (Phase 2A + 2B)
A5710 · Phase 2 Mobilisation · 10d · 11 Jul 2028 A5270 · Phase 2A Road · 30d · 25 Jul 5 Sep 2028 A5280 · Phase 2B Road to Mine Site · 120d · 5 Sep 2028 20 Feb 2029
Road to mine site is physically on the critical path. Sequential execution of 2A then 2B no parallelism currently shown.
Chain 4 Accommodation Camp (all 4 activities)
A6260 · Access Road to Camp · 6d A6280 · Camp Pad · 36d A6290 · Camp Modules Delivery · 12d A6300 · Camp Installation · 29d · → 14 May 2029
Camp must be ready before bulk earthworks can begin. All 4 activities sequential with 0 float.
Chain 5 Bulk Earthworks (Crusher + Plant Site)
SP-CON-1031 · Bulk Earthworks Crusher · 37d · 14 May 20 Jun 2029 SP-CON-1121 · Bulk Earthworks Plant Site · 173d · 14 May 3 Nov 2029
173-day plant site earthworks drives the Grinding construction start. No float. Parallel front on Crusher and Plant Site partially overlaps.
Chain 6 Grinding Construction · 659 days · 4 sequential disciplines
SP-CON-1101 · Civil & Earthworks · 75d · 26 Jul 2029 SP-CON-1241 · Concrete · 107d · 9 Oct 2029 SP-CON-1571 · SMP · 360d · 1 Feb 2030 SP-CON-1621 · Electrical & Instrumentation · 150d · 25 Dec 2030 23 May 2031
Longest construction chain. Fully sequential. Any discipline overlap compresses First Gold 1:1.
Chain 7 Commissioning → First Gold
SP-CON-1631 · Pre-Commissioning · 190d · 15 Nov 2030 SP-CON-1641 · C1 Dry Commissioning · 70d · 24 May 2031 SP-CON-1651 · C2 Wet Commissioning · 30d · 2 Aug 2031 SP-CON-1661 · First Production · 0d · 1 Sep 2031
Terminal chain. Commissioning durations are technically constrained limited compression opportunity without process change.
ESTIMATE SNAPSHOT WBS BREAKDOWN
TOTAL ESTIMATE
MATERIAL
EQUIPMENT
LABOUR
ACCURACY RANGE
Material
Equipment
Labour
Cost Breakdown by WBS Category
WBS CATEGORY MATERIAL EQUIPMENT LABOUR OTHER TOTAL SPLIT
⚠️ Note: WBS breakdown figures shown are derived from loaded estimate line items. Values reflect extracted data as of ETL date shown. Cross-project comparisons should account for estimate class accuracy ranges. Material column highlighted in navy for quick identification.